2017 Paving

The paving project for the summer of 2017 will take place in the northwest portion of the Township within The Howe Terrace Subdivision.  The roads that are affected are Howe Terrace, Pheasant, Grace and Linder Lanes, Arlington, Prospect, Hawthorne and Hawk Drives,  Briar Place, Roth Avenue and Oak Court.  Additionally, new street and traffic signs will be installed to meet […]

Read more...

2016 Paving

This past 2016 spring/summer, we resurfaced the Woodlands Subdivision in the southeast section of Palatine Township. Roadways were surveyed for drainage concerns, milled, patched and new asphalt, surface course was placed. These roadways included Briarwood, Brookdale, Linden and Thorntree Lanes and Brookdale Courts. We installed new high intensity prismatic traffic signs to provide better retro-reflectivity […]

Read more...

2014 Paving

The paving project for the summer of 2014 will take place in the northwest portion of the Township within The Barrington Trails Subdivision.  The roads that are affected are Wedgewood, Foxwood and Palm Drives and Deerpath Road and Anna Court.  Additionally, new street and traffic signs will be installed to meet new federal mandates.  We anticipate […]

Read more...

2013 Paving

The paving project for the summer of 2013 includes two areas with one in the northeast section of the Township and the other in the southern section.  The Tiburon subdivision in the northeast section along with a portion of Nichols Road and Bloomington Avenue will not only be resurfaced but failed curb and gutter will be replaced, accessible crossings […]

Read more...

2012 Paving

The paving project for the summer of 2012 include areas in the north section of the Township.  These roads include Hillside Road, Grove Lane, Beaumont Lane, Knoxboro Lane and Francis Lane.  We anticipate starting construction in September of 2012.  Please be aware of construction signs once a schedule has been finalized.  Additionally, check below for […]

Read more...

2011 Paving

Paving projects for the summer 2011 include several areas in the North section of the Township.  They include Thunderbird Estates, Joan Drive, White Tail Pond, Nantucket Court, Whispering Oaks Lane, Hidden Oaks Drive, Deer Path Lane, and Crooked Creek Lane.  Check below for maps of areas… 2011-Paving-01 2011-Paving-02 2011-Paving-03

Read more...

2010 Paving

Roadway paving projects for 2010 include: All roads within Lake Park Estates, including Echo Lane and Hill Road.  Fielding Place Subdivision is also scheduled to be repaved along with Frances Lane to the south.  We have anticipated this work to be around $600,000 and have explored additional cost cutting measures such as intergovernmental contracts.  This would increase […]

Read more...